Morrison is foothills country — rock close to the surface, real slope, and lots where a straight run of fence is the exception. This is where core drilling and stepped fence lines earn their keep.
Every town on the Front Range has its own combination of ground, wind and expectations. These are the builds that tend to make sense in Morrison — though the right answer always depends on your specific lot.
Steel pipe set in concrete, sleeved inside a cedar post. No wood touches soil, so it can't rot from the ground up.
Powder-coated steel or aluminium with finials and scrollwork. Security that still looks good from the street.
Classic Colorado ranch look. Marks a line without walling off the view; add wire backing to make it pet- and livestock-tight.
Pasture and livestock containment on steel T-posts or braced wood corners.
Cedar frame with welded wire panels — contains pets and kids without blocking the view.
We build every style on our fence types page anywhere we work — this is just where we'd usually start the conversation in Morrison.
When you hit rock at eighteen inches, an auger stops being the answer. We core drill, set in concrete, and step the fence with the grade instead of fighting it. It's slower work and we'd rather tell you that up front than discover it mid-job.
Acreage changes the maths. Split rail, wire and barbed wire cover distance affordably, braced H-assemblies at every corner and gate keep the line tight, and gates get sized for a trailer rather than a wheelbarrow.
Where we hit rock, we core drill rather than pretend an auger will do it. Posts are set in concrete below the frost line, and the fence steps with the grade.
Cantilever slide gates to 30 feet, swing gates, operators, keypads and safety loops.
See gate work →Decks, pergolas and shade structures built to the same standard as the fence.
See deck work →Grading, rock, edging and the finish work that makes a new fence look finished.
See landscaping →Most Front Range municipalities require a permit above a certain fence height, and setback rules vary by lot. We handle the paperwork as part of the job. Always confirm current requirements with the Morrison planning department or Jefferson County directly, since local codes change and we'd rather you hear it from the source than from us.
Where we hit rock, we core drill rather than pretend an auger will do it. Posts are set in concrete below the frost line, and the fence steps with the grade.
A standard residential yard is usually a two to three day build once materials are on site. Concrete needs time to cure before gates get hung, so we don't rush that step. Larger properties and commercial work get scheduled individually.
We'll build to whatever your covenant specifies and can give you the material and style details your HOA needs for its submission. Getting approval itself stays with you as the homeowner, since the HOA needs it to come from the property owner on record.
Spring and early summer are the busiest stretch on the Front Range. If you want a fence up before summer, call in late winter. Fall is often the easiest time to get on the schedule and the ground is still workable.
Tell us about your lot and we'll come measure it. Free estimates across Jefferson County and the rest of the Front Range.