Perry Park is red rock formations, ponderosa and wildlife. Ground conditions vary wildly across a single lot, and deer and elk pressure means a fence has to be built to be leaned on.
Every town on the Front Range has its own combination of ground, wind and expectations. These are the builds that tend to make sense in Perry Park — though the right answer always depends on your specific lot.
Steel pipe set in concrete, sleeved inside a cedar post. No wood touches soil, so it can't rot from the ground up.
Powder-coated steel or aluminium with finials and scrollwork. Security that still looks good from the street.
Classic Colorado ranch look. Marks a line without walling off the view; add wire backing to make it pet- and livestock-tight.
The premium privacy build — fascia hides the picket tops, a flat 2×6 caps the fence, and it reads as a wall.
Pasture and livestock containment on steel T-posts or braced wood corners.
We build every style on our fence types page anywhere we work — this is just where we'd usually start the conversation in Perry Park.
When you hit rock at eighteen inches, an auger stops being the answer. We core drill, set in concrete, and step the fence with the grade instead of fighting it. It's slower work and we'd rather tell you that up front than discover it mid-job.
Elevation means heavier snow, harder wind and animals that will lean on, push through or jump anything marginal. Heavier posts, stronger connections and honest material choices — this is not where to save a few hundred dollars.
Acreage changes the maths. Split rail, wire and barbed wire cover distance affordably, braced H-assemblies at every corner and gate keep the line tight, and gates get sized for a trailer rather than a wheelbarrow.
Posts go deeper here than they do on the flats — we set below the local frost line and account for snow load and wind, which at this elevation is not a formality.
Cantilever slide gates to 30 feet, swing gates, operators, keypads and safety loops.
See gate work →Decks, pergolas and shade structures built to the same standard as the fence.
See deck work →Grading, rock, edging and the finish work that makes a new fence look finished.
See landscaping →Most Front Range municipalities require a permit above a certain fence height, and setback rules vary by lot. We handle the paperwork as part of the job. Always confirm current requirements with the Perry Park planning department or Douglas County directly, since local codes change and we'd rather you hear it from the source than from us.
Posts go deeper here than they do on the flats — we set below the local frost line and account for snow load and wind, which at this elevation is not a formality.
A standard residential yard is usually a two to three day build once materials are on site. Concrete needs time to cure before gates get hung, so we don't rush that step. Larger properties and commercial work get scheduled individually.
We'll build to whatever your covenant specifies and can give you the material and style details your HOA needs for its submission. Getting approval itself stays with you as the homeowner, since the HOA needs it to come from the property owner on record.
Spring and early summer are the busiest stretch on the Front Range. If you want a fence up before summer, call in late winter. Fall is often the easiest time to get on the schedule and the ground is still workable.
Tell us about your lot and we'll come measure it. Free estimates across Douglas County and the rest of the Front Range.